Comprehensive Zoning By-law Review
The Town has initiated a comprehensive review of the existing Town of Caledon Zoning By-law. For more information, including project updates, please visit: https://haveyoursaycaledon.ca/caledonzoning
- What is a Zoning By-law?
Zoning By-laws are regulations governing land use that implement policies in the Town's Official Plan , and are regulated by Section 34 of the Planning Act , R.S.O. 1990, c. P.13 in Ontario.
Each provision and zone within the Zoning By-law has specific requirements that control the use of land and provide a legally enforceable way of managing land use and guiding future development.
The Zoning By-law regulates:
- Land use
- Building/structure location on a property
- Building density, height, massing, type, and setbacks
- Landscape and amenity area requirements
- Lot size and dimension requirements
- Parking and loading facilities
- Specific use requirements (such as Cannabis Facilities, Bed and Breakfast, Accessory Structures, etc.)
In certain situations, the Zoning By-law also requires compliance with Minimum Distance Separation (MDS) Formulae which mitigates odour between agricultural and non-agricultural uses.
Comprehensive Zoning By-law 2006-50, as amended, applies to all lands within the Town of Caledon with few exceptions (see Section 1.10).
Find your zoning
Find out what your zone is by using our interactive map below!
- Structural Envelope maps (S.E.)
Zoning By-law
- Review the Zoning By-law by section.
- Review the appropriate section of the zoning By-law.
- Zoning By-law Sections
- Table of Contents
- Section 1 – Interpretation and Administration
- Section 2 – Establishment of Zones
- Section 3 – Definitions
- Section 4 – General Provisions
- Section 5 – Parking Loading Standards
- Section 6 – Residential Zones
- Section 7 – Commercial Zones
- Section 8 – Industrial Zones
- Section 9 – Institutional Zones
- Section 10 – Agricultural and Rural Zones
- Section 11 – Environmental Policy Area Zones
- Section 12 – Open Space Zones
- Section 13.1 - Exceptions
- Section 13.2 - Exceptions - Beacon Hall Lands
- Section 13.3 - Holding Provisions
- Section 13.4 Temporary Use Zones
- Section 13.5 - Planned Development Zones
- Section 14 - Enactment
- Interim Control By-law
- By-law 2021-92 & By-law 2022-86
- The Interim Control By-law (2021-92) restricts the use of land within the specified areas in Bolton and Mayfield West for a period of one year (to December 14, 2022), to undertake a land use study to:
- Examine the mix of land uses within the Major Transit Station Area (MTSA);
- Examine the existing and long range planned transit service for the study areas, and;
- Consider the connections between the future Mayfield West Transit Hub and the Caledon GO Station between each other and the broader Regional transit system.
- Council has the authority to extend the period during which the by-law will be in effect to a total period not exceeding two years.
- This Interim Control By-law was extended by By-law 2022-86 and now expires on December 14, 2023.
- The Interim Control By-law (2021-92) restricts the use of land within the specified areas in Bolton and Mayfield West for a period of one year (to December 14, 2022), to undertake a land use study to:
- By-law 2022-071
- By-law 2022-072
- Minister's Zoning Orders - In accordance with the Planning Act. Orders do not form part of Zoning By-law 2006-50.
- Ontario Regulation 210-13
- Zoning By-law 87-229
- Zoning By-law 88-083
- Airport Regulation Zoning (AZR)
Schedules
View the following schedules in the Zoning By-law:
- Schedules
- Schedule A - Zoning Map Index
- Schedule B – See above Structure Envelope Maps
- Schedule C – Wayside Pits
- Schedule D – Oak Ridges Moraine Conservation Plan – Areas of High Aquifer Vulnerability
- Schedule E – Oak Ridges Moraine Conservation Plan – Areas of Special Prohibitions
- Schedule F – Oak Ridges Moraine Conservation Plan – Designated Agricultural Areas
- Schedule G - Bolton Core Overlay Zone Area
Appendices
View the appendices to the Zoning by-law:
- Appendices
- Appendix 1-1 – Lot Line Illustrations
- Appendix 1-2 – Corner Lot, Parallel Lot Lines, Yard Definitions
- Appendix 1-3 – Corner Lot, Curved Lot Lines, Yard Definitions
- Appendix 1-4 – Irregular Lot, No Rear Lot Lines, Yard Definitions
- Appendix 1-5 – Irregular Lot, No Parallel Lot Lines, Yard Definitions
- Appendix 1-6 – Lot Frontage, Daylight/Sight Triangle
- Appendix 2 - Driveway Measurement Illustrations
Amending the Zoning By-law
Sometimes it's not possible to meet all of the Zoning By-law requirements. You can change your plans to meet the requirements, or apply for a preliminary meeting to discuss your proposal. If you can't meet the Zoning By-law you may need to apply for either a Zoning By-law Amendment or a Minor Variance application.
Request a compliance letter
A compliance letter can be used for:
- Written confirmation of the Official Plan designation and Zoning of a property
- Establishing an Inspection Station
- Establishing a Propane Cylinder Exchange program
- Establishing a Day Nursery
- Establishing a Before/After School Program
Request a zoning certificate
You can apply to have your zoning reviewed (including uses and buildings/structures) to see whether it complies. A Zoning Certificate may be requested for any reason, including:
- To have a zoning review done before you submit a planning application
- For a proposed Motor Vehicles Sales (OMVIC)
- For a proposed propane distribution centre
- For a proposed day nursery
Request a Zoning Certificate Application.
Request a legal non-conforming use
A legal non-conforming use is a use which was legally established under the Zoning By-law in effect at the time the use began but which is not currently permitted. You can apply to have a use recognized as a legal non-conforming use so long as the original use has continued uninterrupted at that location until today.
- New applications
- To add information in response to a refusal
If you get a letter from the Town refusing your request for a Legal Non-Conforming use, you can add information.
Contact us for an alternative version of any of the documents listed above.